Weekend Montlake Blvd closures

Image

Construction of the University of Washington Station pedestrian/bike bridge construction continues and will have the following impacts:

Image

 - From 7 p.m. on Friday, Sept. 28 until 2 a.m. on Saturday, Sept.  29:

Northbound on Montlake:

- All lanes northbound on Montlake Blvd. including the east sidewalk will be closed.
- Northbound traffic must turn left on NE Pacific Street, right onto NE Pacific Place and turn left back onto Montlake Blvd. at the signal.
- Pedestrians/Bicyclists must use the crosswalk and the west sidewalk between NE Pacific Street and NE Pacific Place.

Southbound on Montlake Blvd:

- One southbound lane will be closed. The west sidewalk will be open between NE Pacific Street and NE Pacific Place.

- From 2 a.m. on Saturday, Sept. 29 until 3 a.m. on Monday, Oct. 1:

Northbound on Montlake:

- All northbound lanes and the sidewalk will be closed between NE Pacific Street and NE Pacific Place.
- Northbound traffic must turn left on NE Pacific Street, right onto NE Pacific Place and turn left back onto Montlake Blvd. at the signal.

Southbound on Montlake:

- All southbound lanes and the sidewalk will be closed between NE Pacific Street and NE Pacific Place.
- Southbound traffic must turn right on NE Pacific Place, Left onto Brooklyn, left onto NE Boat Street, left onto 15th Avenue NE, right onto NE Pacific Street, back to Montlake which merges with Montlake Blvd SB.
- Southbound traffic follow posted detour route.

Construction schedules are subject to change. Notifications will be sent out for significant changes. Please visit www.soundtransit.org/UWstation for more information about the University Link light rail project or contact Rhonda Dixon at (206) 370-5569 or ulink@soundtransit.org.

Share this post