Saturday Morning Social Ride with Amigos (Moderate)
35 mi.
Image
-
Eastside Hills #156 (Brisk)
50 mi.
Image
-
Cranksgiving 2025
-
FRUMPS: Renton to Alki Lighthouse (Steady)
36 mi.
Image
-
TGIF Night Out: North Lake Washington Loop Clockwise (Moderate)
29 mi.
Image
-
Fall City Red Barn Loop with Ames Lake Spur (Moderate)
38 mi.
Image
-
Midweek Tune-Up: 6 or 7 Hills of Kirkland (Moderate)
37 mi.
Image
-
Gravel: Short Out and Back Tolt Pipeline and Redmond Watershed (Moderate)
16 mi.
Image
-
ROAD: Ride On After Dark (Vigorous)
24 mi.
Image
-
ROAD: Ride On After Dark (Brisk)
24 mi.
Image
-
ROAD: Ride On After Dark (Moderate)
21 mi.
Image
-
ROAD: Ride On After Dark (Steady)
21 mi.
Cascade’s 2026 Seattle Bike Network Priorities
With federal bike lane funding being slashed, Seattle must move quickly to deliver the $133.5 million in bike investments in the Transportation Levy.
Cascade's 2026 priorities include advocating for a safe bike route through the Rainier Valley and completing the connection from East Marginal Way to South Park.
Read about our other priority projects for 2026 and beyond, which include making Aurora Avenue a Complete Street and finishing the Beacon Hill bike lanes.
Advocacy navigation page with links to calls for action
Meet Cascade’s 2025 Volunteers of the Year
Whether fixing bikes as an Outrider, rescuing and delivering food for the Pedaling Relief Project, or teaching kids the joy of biking, our 2025 Volunteers power Cascade’s mission.
Read about why they donate time to Cascade, and sign up to volunteer if you also want to spread the joy of bicycling.